Wooden floor insulation is a fairly simple occupation, which takes relatively little time. People with little experience easily insulate the floor of the room for one day.

 

Without elementary, but very necessary knowledge, it is better not to begin to engage in insulation. It is necessary to choose the desired material, the means for construction work and much more. The cool surface of the floor is not only unpleasant, but also dangerous to health, so the importance of insulation unambiguously should be taken into account.

 

4001

Required tools and materials to create a warmed floor

 

  1. Fastening elements. This can include self-tapping screws and nails. Without it, it will not be possible to securely secure the warmed design.
  2. Among the tools it is necessary to have a hammer with a nail-cutter, a saw, roulette, a small bruster, a screwdriver, level, as well as a pencil for marks.
  3. The necessary materials include wooden rails, boards, rolled insulation, membrane isolation, fire-fighting composition, beams of the required section.

uteplenie-Pola.

 

Specificity of the floor insulation of the private house

 

It is worth saying that the insulation of the wooden floor most often occurs in private dwellings. Such houses have a relatively large area, but not very serious heating capabilities. Thus, to maintain heat, we need to insulate not only the walls, but also the floor. After all the actions on floor insulation are completed, it will immediately be warmer and more cozy.

12121212

In a large private house, you do not need to immediately "fall" to all rooms, doing insulation. Sometimes unexpected problems arise, because of which the premises cannot be used, besides, it has no pleasant look. Gradually move from one room to another - the best solution.

You should pay attention to the materials that are used for insulation. You should always make a choice in favor of durable and efficient construction resources.

 

wPID-409.

Wood floor insulation

 

Warming planning

 

Before the main actions, we need to seriously analyze the situation. For convenience, it will take to remove all the furniture and other items from the room that will interfere with the process. Next, we need to remove the top layer of the floor. In order to disassemble all the boards, we will need a mount either a nail. It is now important to assess the condition of the sample. If there are residues of clay and other materials, it will be necessary to remove it all. Next, you need to make sure that the bearing lags are really strong and will serve at least a dozen years. If there is no confidence in the positive condition of the floor, it is better to carry out a number of carpentry work. Many elements will definitely have to replace. For this, both boards and various planks are needed. Often and fasteners become unfastened, so you need to pull old nails and self-tapping nails and the nails and then install new ones.

miniatura27

 

Floor insulation process

 

  1. During the first step of creating insulation of sex, we will need to seriously approach the creation of a design, which should contain the main insulation. As already mentioned, you need to get rid of those bars that look not the most reliable. This is considered the most time-consuming stage, because often lagows are a serious design, where there are several dozen bars with a variety of geometric parameters. For the reliability of lags are flooded with a concrete mixture. Sometimes for this reason, this or that bar is very difficult. Furies of lags need to be attached to dry gravel. Only then the confidence appears in the fact that this design will last long. After the fill of the surface, concrete you need to wait until the material creates. Before that, no action related to insulation cannot be carried out.
  2. Next, the process of wood insulation of a wooden floor with their own hands continues with a stuffing boards. Immediately it should be understood that it is impossible to knit black material to lags. First, it is necessary to attach the crate to the bars of the floor. This is done with the help of self-tapping screws. The pebble is parallel bars with a cross section of 50x50 mm. After that, we begin the nails to fasten to the blackboard clamp. Experts advise to fix the draft boards with the help of massive nails that would be with their edges to be lag. It is important to draw attention to the need to use antiseptic compositions. With their help, wood will maintain its original properties for dozens of years, not leaving rotting and other negative processes. In addition, most of these antiseptic compositions will cost at a low price.
  3. Now it's time to think about waterproofing. It is worthwhile that for sex you need to use the film waterproofing of the membrane type. This allows moisture easy to go down and no longer climb upstairs. This moment is very important, since the lack of membranes in waterproofing will provoke the accumulation of moisture, and this can be considered the beginning of the end for the design of the floor. The fastening of film waterproofing occurs with the help of moisture-resistant tape. Make these manipulations should be as close as possible.
  4. Next you need to create another layer of lag. It is important to understand that all bars need to be attached exactly, checking the work done by the work. Lag fastening step - 1 meter. The profiles themselves of the bars must be at least 50x150 mm. A value of 150 mm determines the thickness of the future insulation. Thus, it will be necessary to put it in these lumeges between the bars. The dimensions of the future insulation depends on the size of the lag. If they have a greater height, it is possible to put several units of the insulation. The mount is performed using self-tapping screws.
  5. Now we are approaching the completion of the repair work. Between the bars should be laid foam. It is necessary to calculate all sizes so that the material for insulation is maximally approached by parameters. The gaps between the bars and the foam cannot be allowed. You can also apply mineral wool, which is an excellent insulation not only walls, but also gender. There is the possibility of combining various insulation. Material is not necessary. After the entire area of \u200b\u200bthe room we laid the insulation, you must mount the floor. For this you can use old boards, but if their quality is not high enough, it is better to use new ones. Mounting floor surface elements can be nails, and even screws. What fasteners you will get faster to make the entire volume of work, those you need to choose. If you have a desire to improve the floor, you can buy a laminate. It is extremely easy to install, it is enough to fix the elements of the coating using the grooves. For additional amenities, you can store the floor of the Fiberboard sheets. After the end of these operations, you can safely walk on the floor of the floor with barefoot, feeling warm.

 